Marine Structure Work

North Bahrain New Town project

Marine Channel Excavation Works (Marine works)

Excavation of marine channels in the sea -2.5 m BNDL, Quantity of excavation approximate 4,300,000 m3

<<Photo Album >>


Replacement of Sitra Bridges
Rock Quarry Run Bund construction and Rock Armouring along the Sitra New causeway & Excavation of Northern Channel

<<Photo Album >>


Land Reclamation Project for 24 Luxury Villas
at the Bahrain Ritz Carlton Hotel

This project involved the reclamation and levelling of 80,000 square metres of land from the sea to facilitate the construction of 24 luxury villas in the Seef District. This work comprised large quantities of rock excavation from the seabed and construction of coastal rock structures to protect the reclaimed land from the sea and also involved the creation of a new sand beach. The project was completed successfully and within an accelerated 3-month schedule.

<< Photo Album >>



LuLu Roundabout – Central Market, Seef District

The Company actively participated in the sea reclamation program for this high-profile development in the Seef District. The project was performed in-the-sea at a depth of approximately 8 metres under difficult marine conditions. A 1.5 kilometre long rock bund 100 metres wide was constructed to facilitate installation of teh main road. The project also involved the construction of an anchor wall structure for the main fibre-optics marine cables (FOG) in deep sea for Batelco, Bahrain’s national telecommunications provider. This also included twin-pipe sub-aqueous installations at an underwater depth of 8 metres. The FOG is one of the most important Batelco cables linking Bahrain to its neighbouring countries. Al Hassanain Co is proud of its accomplishments on this project which required the Company to meet its objectives while operating in a very harsh marine climate... a challenge that was met and completed with complete success.

<< Photo Album >>



Coastal Highway Sea-Defence Protection

The Company was involved in the construction of sea-defence structures along the main coastal highway linking the Hidd Industrial Area and the modern Amwaj Island ay Galali. This project also included construction of several 1000mm diameter concrete pipeline/culverts under the coastal highway to provide water movement between the inland lake and the sea.

<< Photo Album >>


The Company is well equipped with a modern fleet of advanced heavy-construction equipment operated by highly-skilled and well trained personnel. Our combination of marine engineering professionals and a skilled workforce permit us to undertake complicated marine coastal works involving land reclamation, shore protection works and artificial sand beach creation. Our marine works department has also completed seabed rock excavation works as well as construction of offshore structures. Some of the more prominent projects that we have participated in include: