North Bahrain New Town project
Marine Channel
Excavation Works (Marine works)
Excavation of marine channels in the sea -2.5 m BNDL, Quantity of excavation
approximate 4,300,000 m3
Replacement
of Sitra Bridges
Rock Quarry Run Bund construction and Rock Armouring along the Sitra New causeway
& Excavation of Northern Channel
Land
Reclamation Project for 24 Luxury Villas
at the Bahrain Ritz Carlton Hotel
This project involved the reclamation and levelling of 80,000 square metres
of land from the sea to facilitate the construction of 24 luxury villas in
the Seef District. This work comprised large quantities of rock excavation
from the seabed and construction of coastal rock structures to protect the
reclaimed land from the sea and also involved the creation of a new sand beach.
The project was completed successfully and within an accelerated 3-month schedule.
LuLu Roundabout
– Central Market, Seef District
The Company actively participated in the sea reclamation program for this
high-profile development in the Seef District. The project was performed in-the-sea
at a depth of approximately 8 metres under difficult marine conditions. A
1.5 kilometre long rock bund 100 metres wide was constructed to facilitate
installation of teh main road. The project also involved the construction
of an anchor wall structure for the main fibre-optics marine cables (FOG)
in deep sea for Batelco, Bahrain’s national telecommunications provider. This
also included twin-pipe sub-aqueous installations at an underwater depth of
8 metres. The FOG is one of the most important Batelco cables linking Bahrain
to its neighbouring countries. Al Hassanain Co is proud of its accomplishments
on this project which required the Company to meet its objectives while operating
in a very harsh marine climate... a challenge that was met and completed with
complete success.
Coastal Highway Sea-Defence Protection
The Company was involved in the construction of sea-defence structures along
the main coastal highway linking the Hidd Industrial Area and the modern Amwaj
Island ay Galali. This project also included construction of several 1000mm
diameter concrete pipeline/culverts under the coastal highway to provide water
movement between the inland lake and the sea.